The next department is the KENDALIAN department. I went to the Fault Finder's office on the 1st day in the new department. This is the place where we call TNB to report that we do not have electricity in our houses, that the streetlights outside our houses are not working etc etc.

Once a report is received, the Fault Finders team will head out to the location to investigate the matter. If it is a very small matter, then they will fix it, or else, they will have to ask the gangs of other departments concerned to fix it, such as the SAVR gang. The people in this department work in shifts. Therefore, there will be people in this office all the time. There are supervisors who receive reports from customers and they are the ones who assign the Fault Finders team according to their zones (North or South).
I spent roughly 4 days in this office, answering phone calls, attending to customers who dropped by the office and helped to key in complaint reports into the Excel worksheet. Then Saiful, a technician in the department, asked me to help him to type out the shutdown jobsheet and also the Notis Gangguan Bekalan for customers.
A shutdown is when TNB cuts off the electricity supply in substations for maintenance purposes or other work such as laying new underground cables.

A breakdown is when the electricity supply is cut off due to a tripped switch in the VCB or a fuse is blown in the substation.
I got the opportunity to follow En. Nasir to the PMU (Pencawang Masuk Utama) in Kamunting when there was a breakdown one day. This is where the electricity supply enters after the transmission towers.


PPU is Pencawang Pengambilan Utama. It is almost similar to PMU except that it is smaller in size.


Inside the PPU is a row of switches to designated locations.
While having lunch with En. Rizal, Saiful, the new engineer, En. Shukri and the other trainees in Tmn Medan Taiping, we heard a loud explosion at the construction site nearby. We went to the scene and saw that the construction workers had accidentally damaged the NEW underground cables. According to En. Rizal, the new underground cables were layed just a few months ago to a new position because of the construction of an overhead bridge over the railway tracks.

They used sand to get rid of the fire. Instantly, the area nearby were affected because of this. Switching has to be done and electricity has to be supplied from other sources. One good thing with our electricity system is that we always have a backup supply from other sources. This supply is only temporary till the real problem is fixed. And so, En. Rizal went to the PMU Taiping no. 1 to do the switching.

Then we went to a few substations to give temporary supply to the consumers.
To check whether the cables are in good condition after a breakdown occurs, an IR (Insulation Resistance) test is done.


If the reading shows more than 100M ohms, then the cables are in good condition.
The HOD for Kendalian is En. Azhan. He told me he is a graduate from UNITEN in 2007.
The next department is Pembinaan (Construction) department.