Thursday, April 15, 2010

CT meter

Yesterday (14 April), I got the opportunity to observe how wiring is done in a CT (Current Terminal) meter board. I followed Amir to the TNB Stor and En. Zol came in and did the wiring.

MK6N Genius : This type of meter is specially for CT. From what I learnt from Amir, this meter has current specifications, such as 100A, 150 A etc. It depends on what the consumers request. For example, a consumer applies for 150A. If the current usage exceeds 150A, the meter will be damaged and the consumer will be charged with penalty. This meter has several display functions. It could display kWh, current, voltage and kW, to name a few.

Front part of the meter board

Back part of the meter board

The wiring is done at the back part

After the wiring is done, it is now time to install the meter.

This is how the meter board looks like when it is done.

Then we went to Taman Pengkalan Maju to the place where we were supposed to install the meter board.
This is how the meter board is fixed.

The black components the hands are holding are the current terminals. This is where the supply comes in. Can see the 3-phase cables. There are some wiring to be done here too.

En. Zol did the wiring on the meter board.

After all the necessary wiring had been done, Nasrizan installed the fuses in the substation to supply electricity to the place we were at. Then En. Zol put in the fuses onto the meter board and the meter is up and running.

By the time we finished, it was past 6pm. Yesterday's experience was indeed an eye-opener for me and I come to realise that there are a lot of things to be done, just to install a CT meter for a consumer.

2 more days before I leave the department.

No comments: